TRD has completed projects across Australia and is now entering the international market. Browse our project portfolio which reflects the company’s dedication to innovation and excellence.
Paramount on Parkes, ALAND

20 Parkes Street, Harris Park NSW. Post-Tension Supply & Install. Paramount on Parkes is a 39-storey mixed-use tower by award-winning Sydney apartment developer ALAND, featuring 331 high-quality apartments in the heart of the Parramatta CBD.


Completed: 2024

Archibald, ALAND

108 Donnison Street, Gosford NSW. Post-Tension Supply & Install. Archibald by ALAND is a landmark $375M mixed-use development in Gosford, comprising two striking towers with 327 residential apartments, resort-style pool, and ground-floor retail, setting a new benchmark for coastal CBD living.


Completed: 2025

Jasmine, Schofield Gardens, ALAND

38 Manchester Drive, Schofields NSW 2762. Post-Tension Supply & Install. Jasmine is the latest release from ALAND’s Schofield Gardens masterplanned community, featuring 405 apartments set among green open spaces in Sydney’s thriving North-West corridor.


Completed: 2025

The Landmark Quarter – BINAH CONSTRUCTIONS

8 Marshall Avenue, St Leonards NSW. Post-Tension Supply & Install. A landmark luxury residential development featuring three towers with 234 apartments, offering stunning Sydney Harbour views with premium amenities including a landscaped precinct, pool, spa, sauna, gym, and cinema.


Under Construction: Est. 2027

Bourke Street Zetland – BINAH CONSTRUCTIONS

890-898 Bourke Street, Zetland NSW. Post-Tension Supply & Install. A 5-level build-to-rent development for Aware Super, featuring 135 apartments with gym, lounge, music room, rooftop terrace and landscaped central garden, located 5km from Sydney CBD.


Under Construction: Est. 2026

Balfour Place – CONQUEST

376-384 Pacific Highway, Lindfield NSW 2070. Post-Tension Supply & Install. A boutique luxury residential development featuring 59 premium 1, 2, 3 & 4 bedroom apartments designed by Rothelowman, nestled in the heart of Lindfield with ground floor retail and rooftop amenities.


Completed: 2025

Caringbah Pavilion – CONQUEST

41-51 President Avenue, Caringbah NSW 2229. Post-Tension Supply & Install. A stunning collection of 188 residences comprising 1, 2 and 3 bedroom apartments in Caringbah’s thriving town centre, 200 metres from Caringbah train station.


Under Construction: Est. 2026

Forme – HOLDMARK PROPERTY GROUP

Top Ryde, Ryde NSW. Post-Tension Supply & Install. A landmark mixed-use development on the water’s edge in Ryde, inspired by the Ryde Bridge. Features premium residential apartments with vibrant ground floor retail and dining.


Under Construction: Est. 2026

Florence & Capri – MASSCON

3 & 9 Bennelong Parkway, Wentworth Point NSW 2127. Post-Tension Supply & Install. Twin residential towers at the One The Waterfront precinct, offering premium apartments with sweeping harbour and city views.


Completed: 2025

Peninsula – MASSCON

177 Albany Street, Point Frederick NSW 2250. Post-Tension Supply & Install. A collection of 100 premium waterfront apartments across three contemporary buildings — Albany, Duke and Auburn — on the highest point of Point Frederick.


Completed: 2022

Jacaranda Residences – MASSCON

16 Jenkins Street, Carlingford NSW. Post-Tension Supply & Install. A residential development comprising 133 well-appointed apartments across two buildings of 6 to 9 levels, featuring 1, 2 and 3-bedroom apartments.


Completed: 2024

Astina Group, East Side Quarters

65 Mulgoa Road Penrith NSW. Post-tension supply and construction for One Eastside, the first stage of East Side Quarters compromising of 158 apartments across four low rise buildings located on Retreat Drive. Total value: $100M+


Completed: 2020

Pinnacle Schofields, The Bathla Group – Stage 16B Only

16A Pelican Road Schofields NSW. Post-Tension Design Supply & Installation for stage 16B. Pinnacle Schofields compromises 270 luxury living apartments across five towers ranging five to six stories. Total value: $150M+


Completed: 2020

The Habitat – Chong Jian Construction Australia CJCA

19-23 Post Office Street Carlingford, NSW. Post-Tension Design Supply & Installation for 120 High-end units across 3,5 storey buildings topping 239 carpark spots..The 3 addresses of Habitat are linked by a luscious landscape thoroughfare composed of Australian natives, tropical palms and Asian florals. Total value: $150M+


Completed: 2020

Astina Group, Astina Suites

21-25 Woodriff St, Penrith NSW. Post-Tension Construction for 58 luxury suites complimented by ground floor wine bar, cafe, office, valet parking, private garden, rooftop pool, gym and function centre. Project Value:40M$


Completed: 2020

The Gem, Greenway Australia

36-38 Showground Road, Gosford, NSW. Post-Tension Design Supply & Installation for The Gem, comprising 34 high-end units on top of a Child Day Care Centre in the complex for total convenience and three retail shops on street level for a Cafe, General Convenience Store or Professional Services, in addition to 80 carpark spots. Project Value:30M$+


Completed: 2020

Holdmark, Majors Bay Village

16 Bennett St Mortlake NSW. Post-tensioning construction for 60 high-end units across 2×4-5 storey buildings plus underground basement carpark. Total value: $40M.


Completed: 2019

Devcon Partners, Artists Impression

10-12 Vista St Penrith NSW. Post-tensioning construction for 2×6 storey mid-rise residential buildings of 79 residencies, 2 basement levels and 108 car spaces. Total value: $40M.


Completed: 2019

TQM, Everton

19 – 25 Everton Rd Strathfield NSW. Steel reinforcing of ten-level building, of 70 residential units, two levels of basement parking, one retail space and one commercial space. Total value: $30M.


Completed: 2019

TQM, Avante

3 Rawson St Wollongong NSW. Steel reinforcing of a 19 storey building, of 77 residential apartments, 5500m2 of commercial space and 3 levels of basement parking. Total value: $90M.


Completed: 2019

YTO Constructions, The Place Ashfield.

5 Markham Ave and 7 & 9 Cavill Ave, Ashfield. Post-tensioning design and construction for 3-8 storey mixed use development comprising 91 dwellings and 7 retail, above 3 levels of basement car parking. Total value: $78M.


Completed: 2018

Astina Group, City Vista Apartments

13 Vista StPenrith, NSW. Post-tensioning construction for 26 apartments across 5 levels above carpark basement. Total value: $15M


Completed: 2019

Dazray, Macklin Place

38-40 Macklin St, Pendle Hill NSW. Post-Tensioning Construction for 3 storey residential building of 15 apartments above a carpark basement. Project value $3.4M.


Completed: 2019

Binah Constructions, The Auburn

Site address: 172 South Pde Auburn NSW. Post-tensioning construction for 48 residential apartments over 5 basements, 12 levels over a ground floor retail. Total value: $14.5M.


Completed: 2018

Yunlong Building, Vernon Heights

49 – 51 Veron St Wentworthville NSW. Post-tensioning design and construction, steel reinforcing for 32 residential apartments over 2 basements. Total value: $18M


Completed: 2019

MNR Investments, The Amirah

76 – 78 Queens St Auburn NSW. Post-tensioning Design and construction and steel reinforcing for 8 storey mixed used development compromising 51units and retail tenancy over 2 levels of basement car park. Total value: $35M


Completed: 2019

Themis Constructions

26 Parnell StStrathfield NSW. Post-tension design and construction, formwork, steel reinforcing and concrete placement. 10-level building of 45 residential units with 2 basement parking and ground floor commercial/retail spaces. Total value: $25M


Completed: 2019